Three workers can do a job in 12 days. Two of the workers work twice as fast as the third, how long would one of the faster workers take to do the job himself?
Three workers can do a job in 12 days. Two of the workers work twice as fast as the third, how long would one of the faster workers take to do the job himself?
ক)
36খ)
32গ)
30ঘ)
24Explanation
1 faster person = 2 slower person so , 2 faster +one slower = 5 slower person 5 slower person can do the work in 12 days 1 ,, ,, ,, ,, 12X5 days= 60 day as, 2 slower = 1 faster then , 1 faster person can do the work in 60/2 = 30 daysRelated questions
What is per capita income of Bangladesh presently in USD?For what value of x is 82x-4= 16x?One side of a rectangle is a inches. If the perimeter is I inches, what is the area of the rectangle in square inches?If the difference between the circumference and diameter of a circle is 60 cm, what is the radius of the circle?Two similar spheres made of the same materials have weights of 32 kg and 108 kg respectively. If the radius of the larger sphere is 9 cm, what is the radius of smaller sphere?If x+y= 8z, which of the following represents the average (arithmetics mean) of x, y and z in terms of z?if a+b=15 and a-b= 1, then ab=?If x=1-3t and y=2t-1 then for what value x=y?