    A signed a contract for building a road of 1920 meters long within 120 days. He employed 160 workers for this task. But after 24 days he found that only 1/8 of the task has been finished. If A want to finish the road in time how many additional workers he has to employee ?

    ক)
    180
    খ)
    120
    গ)
    160
    ঘ)
    280

    Explanation

    Solution: Days remaining = 120 - 24 = 96 Work done = 1920/8 = 240 meter and work remaining = 1920 - 240 = 1680 meter 240 meter is done in 24 days by = 160 men 1   "        "     "    "   1  "      "    = (160 × \times 24) / 240 men. 1680  "         "     "   "   96 "      "     = (160 × \times 24 × \times 1680) / 240 × \times 96  men = 280 men Additional men need = 280 - 160 = 120 Men.
    50 men took a dip in a water tank 40m long and 20m broad on a religious day. If the average displacement of water by a man is 4 m3, then the rise in the water level in the tank will be-A water tank can be filled by two pipes A and B in 60 minutes and 40 minutes respectively. How many minutes will it take to fill the tank from empty state if B is used for half the time, and A and B fill it together for the other half?Two pipes A and B can fill a cistern in 37(1/2) minutes and 45 minutes respectively. Both pipes are opened. The cistern will be filled in just half an hour, if the B is turned off after:Susan can type 10 pages in 5 minutes. Mary can type 5 pages in 10 minutes. Working together, how many pages can they type in 30 minutes?A man can do a piece of work in 5 days. But with the help of his son, he can do it in 3 days. In what time can the son do it alone?নৌকা ও স্রোতের বেগ যথাক্রমে ঘন্টায় ১৮ কি.মি. ও ৬ কি.মি। নদী পথে ৭২ কি.মি. অতিক্রম করে পুনরায় ফিরে আসতে কত সময় লাগবে?A certain number of men can finish a piece of work in 100 days. If, there were 10 men less, it would take 10 days more for the work to be finished. How many men were there originally?A pump can fill a tank with water in 2 hours. Because of a leak, it took 2(1/3) hours to fill the tank. The leak can drain all the water of the tank in:

    Find Tutors

    View all Tutors