Subject
MBA Exam
Topic
IBA MBA 2010-11
A production manager has set the production rate for each worker on a job at 22 units every three hours. At this rate what is the minimum number of workers that should be put on the job if at least 90 units are to be produced per hour?prox)
A production manager has set the production rate for each worker on a job at 22 units every three hours. At this rate what is the minimum number of workers that should be put on the job if at least 90 units are to be produced per hour?prox)
ক)
5খ)
8গ)
12ঘ)
13Explanation
3 ঘন্টায় 22 unit তৈরি করে 1 জন 1 ঘন্টায় 90 unit তৈরি করে (3×90)/22 জন = 270/22 =13 (apporx)Related questions
In the following figure, if the length of the longest side of the following triangle is 36, what is the perimeter of the triangle?There are 4 women and 4 men sitting in a waiting room for job. If two of the applicants are selected at random, what is the probability that both will be women?If (x2– 7x +18) = 6, which of the following must be false?Ehsan can fill a pool carrying buckets to water in 30 minutes. Suman can do the same job in 45 minutes. Tonmoy can do the same job in 1(1/2) hours. How quickly can all three fill the pool together?Two cyclists start biking from the starting point of a trial 3 hours apart. The second cyclist travels at 10 miles per hour and starts 3 hours after the first cyclist who is traveling at 6 miles per hour. How much time will pass before the second cyclist catches up with the first from the time the second cyclist started biking?If 8x + 5x + 2x + 4x = 114, then 5x + 3 =?In the figure right, if CP = BP and x° = 120°, then y = ?Of 45 families in a locality, 25 families have working mothers and 10 families have retired individuals as members to look after the children at home. Of the families, 8 have both working mothers and retired individuals as members. How many of the families have working mothers but no retired individuals as members?
